Roofing Glossary

HERE IS A GLOSSARY OF ROOFING TERMS TO HELP YOU FEEL A LITTLE LESS IN THE DARK DURING ABOUT OUR PROCESS.

Glossary Of Roofing Terms

For homeowners, the roofing process can seem complex. Well, it is. There are many terms that we will use when you hire CMS Roofing for your next Charlotte, Columbia or Charleston roofing project, and we want you to be able to understand them. We believe the more informed our clients are, the better there decisions will be. So here is a glossary of roofing terms to help you feel a little less in the dark during about our process.

  • Asphalt: A bituminous waterproofing agent applied to roofing materials during manufacturing. Asphalt plastic roofing cement: An asphalt-based cement used to bond roofing materials, including flashing.
  • Base flashing: That portion of the flashing attached to or resting on the deck to direct the flow of water onto the roof covering.
  • Blisters: Bubbles that may appear on the surface of asphalt roofing after installation.
  • Built-up roof: A flat or low-sloped roof consisting of multiple layers of asphalt and ply sheets.
  • Butt edge: The lower edge of the shingle tabs.
  • Caulk: To fill a joint with mastic or asphalt cement to prevent leaks.
  • Coating: A layer of viscous asphalt applied to the base material into which granules or other surfacing is embedded.
  • Collar: Pre-formed flange placed over a vent pipe to seal the roof around the vent pipe opening. Also called a vent sleeve.
  • Counter flashing: That portion of the flashing attached to a vertical surface to prevent water from migrating behind the base flashing.
  • Course: A row of shingles or roll roofing running the length of the roof.
  • Cricket: A peaked saddle construction at the back of a chimney to prevent accumulation of snow and ice and to deflect water around the chimney.
  • Cutout: The open portions of a strip shingle between the tabs.
  • Deck: The surface installed over the supporting framing members to which the roofing is applied.
  • Dormer: A framed window unit projecting through the sloping plane of a roof.
  • Downspout: A pipe for draining water from roof gutters. Also called a leader.

Request a Free Estimate

  • Drip edge: A non-corrosive, non-staining material used along the eaves and rakes to allow water run-off to drip clear of underlying construction.
  • Eaves: The horizontal, lower edge of a sloped roof.
  • Eave flashing: Additional layer of roofing material applied at the eaves to help prevent damage from water back-up.
  • Edging strips: Boards nailed along eaves and rakes after cutting back existing wood shingles to provide secure edges for reroofing with asphalt shingles.
  • Feathering strips: Tapered wood filler strips placed along the butts of old wood shingles to create a level surface when reroofing over existing wood shingle roofs.
  • Felt: Fibrous material saturated with asphalt and used as an underlayment or sheathing paper.
  • Fiberglass mat: An asphalt roofing base material manufactured from glass fibers.
  • Flashing: Pieces of galvanized metal (usually aluminum or copper) or roll roofing used to prevent seepage of water into a building around any intersection or projection in a roof such as vent pipes, chimneys, adjoining walls, dormers and valleys.
  • Free-tab shingles: Shingles that do not contain factory-applied strips or spots of self-sealing adhesive.
  • Gable: The upper portion of a sidewall that comes to a triangular point at the ridge of a sloping roof.
  • Gable roof: A type of roof containing sloping planes of the same pitch on each side of the ridge, with a gable at each end.
  • Gambrel roof: A type of roof containing two sloping planes of different pitch on each side of the ridge. The lower plane has a steeper slope than the upper. Contains a gable at each end.
  • Granules: Ceramic-coated colored crushed rock that is applied to the exposed surface of asphalt roofing products.
  • Gutter: The trough that channels water from the eaves to the downspouts.
  • Hip: The inclined external angle formed by the intersection of two sloping roof planes. Runs from the ridge to the eaves.
  • Hip roof: A type of roof containing sloping planes of the same pitch on each of four sides. Contains no gables.
  • Hip shingles: Shingles used to cover the inclined external angle formed by the intersection of two sloping roof planes.
  • Ice dam: Condition formed at the lower roof edge by the thawing and re-freezing of melted snow on the overhang. Can force water up and under shingles, causing leaks.
  • Interlocking shingles: Individual shingles that mechanically fasten to each other to provide wind resistance.
  • Laminated shingles: Strip shingles containing more than one layer of tabs to create extra thickness. Also called three-dimensional shingles or architectural shingles.
  • Lap: To cover the surface of one shingles or roll with another.
  • Lap cement: An asphalt-based cement used to adhere overlapping plies of roll roofing.
  • Mansard roof: A type of roof containing two sloping planes of different pitch on each of four sides. The lower plane has a much steeper pitch than the upper, often approaching vertical. Contains no gables.
  • Masonry primer: An asphalt-based primer used to prepare masonry surfaces for bonding with other asphalt products.
  • Mineral-surfaced roofing: Asphalt shingles and roll roofing that are covered with granules.
  • Nesting: A method of reroofing with new asphalt shingles over old shingles in which the top edge of the new shingle is butted against the bottom edge of the existing shingle tab.
  • No-cutout shingles: Shingles consisting of a single, solid tab with no cutouts.
  • Open valley: Method of valley construction in which shingles on both sides of the valley are trimmed along a chalk line snapped on each side of the valley. Shingles do not extend across the valley. Valley flashing is exposed.
  • Organic felt: An asphalt roofing base material manufactured from cellulose fibers.
  • Overhang: That portion of the roof structure that extends beyond the exterior walls of a building.
  • Pitch: The degree of roof incline expressed as the ratio of the rise, in feet, to the span, in feet.
  • Ply: The number of layers of roofing: i.e. one-ply, two-ply.
  • Rafter: The supporting framing member immediately beneath the deck, sloping from the ridge to the wall plate.
  • Rake: The inclined edge of a sloped roof over a wall.
  • Ridge: The uppermost, horizontal external angle formed by the intersection of two sloping roof planes.
    Ridge shingles or ridge cap: Shingles used to cover the horizontal external angle formed by the intersection of two sloping roof planes.
  • Rise: The vertical distance from the eaves line to the ridge.
  • Roll roofing: Asphalt roofing products manufactured in roll form.
  • Roofing tape: An asphalt-saturated tape used with asphalt cements for flashing and patching asphalt roofing.
  • Run: The horizontal distance from the eaves to a point directly under the ridge. One half the span.
  • Saturant: Asphalt used to impregnate an organic felt base material.
  • Saturated felt: An asphalt-impregnated felt used as an underlayment between the deck and the roofing material.
  • Self-sealing shingles: Shingles containing factory-applied strips or spots of self-sealing adhesive.
  • Self-sealing strip or spot: Factory-applied adhesive that bonds shingle courses together when exposed to the heat of the sun after application.
  • Shading: Slight differences in shingle color that may occur as a result of normal manufacturing operations.
  • Sheathing: Exterior grade boards used as a roof deck material.
  • Shed roof: A roof containing only one sloping plane. Has no hips, ridges, valleys or gables.
  • Slope: The degree of roof incline expressed as the ratio of the rise, in inches, to the run, in feet.
  • Smooth-surfaced roofing: Roll roofing that is covered with ground talc or mica instead of granules (coated).
  • Soffit: The finished underside of the eaves.
  • Soil stack: A vent pipe that penetrates the roof.
  • Span: The horizontal distance from eaves to eaves.
  • Square: A unit of roof measure covering 100 square feet. A roof with a field area of 2,500 square feet would be called a 25 square roof.
  • Starter strip: Asphalt roofing applied at the eaves that provide protection by filling in the spaces under the cutouts and joints of the first course of shingles.
  • Step flashing: Flashing application method used where a vertical surface meets a sloping roof plane.
  • Tab: The exposed portion of strip shingles defined by cutouts.
  • Telegraphing: A shingle distortion that may arise when a new roof is applied over an uneven surface.
  • Top lap: That portion of the roofing covered by the succeeding course after installation.
  • Underlayment: Asphalt saturated felt used beneath roofing to provide additional protection for the deck.
  • Valley: The internal angle formed by the intersection of two sloping roof planes.
  • Vapor retarder: Any material used to prevent the passage of water vapor.
  • Vent: Any outlet for air that protrudes through the roof deck such as a pipe or stack. Any device installed on the roof, gable or soffit for the purpose of ventilating the underside of the roof deck.
  • SCHEDULE SERVICE

Whether you need small repairs to the roof of your family home, or a full replacement of your commercial roofing system, CMS Roofing is your best choice in roofing and roof repair.

Why Choose Morey As Your San Diego
Plumbing, Heating And AC Experts?

One-Job Price And No Hidden Extras

You don’t need to watch the clock when Morey Plumbing, Heating and Cooling, Inc. is on the job. We give you a per job price up front. You don’t pay us by the hour and that means you can relax while we do our job. One job price and no hidden extras.

We Strive For 100% Customer Satisfaction

The title says it all. We want you to be our satisfied customer and strive to provide the best service at a fair price.

24-Hour Emergency Service

Our fast, professional response gets you the service you need when you need it. Our skilled technicians take pride in their work from start to finish.

We Protect Your Investment

Our annual maintenance plans help you to avoid costly surprises and plan your expenses. We help to keep you on budget!

Service You Can Trust

We are licensed, insured and BBB Accredited. You can count on us for our skill, knowledge, courtesy and professionalism.

Get A Free Estimate
On Roofing

Leaky roof driving business away? Family home not as safe and dry as you like? Whether you have a residential or commercial property, CMS Roofing is your one stop for everything roofing. Charleston, Charlotte and Columbia residents turn to CMS Roofing for all their roofing needs. Call 803-732-5558 to set up your FREE roofing consultation today!

We serve Charlotte, Columbia, Charleston, Summerville and Lexington.

Client Reviews


Thanks to all at CMS for being one of the best companies I have dealt with over 30 years of maintaining rental properties and residences.




Sharon R

CMS Roofing
5.0
2019-02-11T20:49:05+00:00

Sharon R

Thanks to all at CMS for being one of the best companies I have dealt with over 30 years of maintaining rental properties and residences.


Thanks so much for the great work your crew did on our roof last week. We have a “dead valley” in our roof and piled debris and incorrect flashing and tie in from the original builder left us with a looming problem. We knew it would leak eventually, but now the roof is fixed and we have peace of mind.




Candice Escoe

CMS Roofing
5.0
2019-02-11T20:09:20+00:00

Candice Escoe

Thanks so much for the great work your crew did on our roof last week. We have a “dead valley” in our roof and piled debris and incorrect flashing and tie in from the original builder left us with a looming problem. We knew it would leak eventually, but now the roof is fixed and we have peace of mind.

Excellent job, per normal expectations. Took some time to fully complete, but we are still very happy and satisfied, once again.


Guy E. Emory II

CMS Roofing
5.0
2019-02-11T21:01:51+00:00

Guy E. Emory II

Excellent job, per normal expectations. Took some time to fully complete, but we are still very happy and satisfied, once again.

I want to thank you and your employees for a job well done. I had called four different companies the day I called you. One company called me back in 4 days, another called back in 7 days and the third never did call back. Your estimator was at my house the next day as promised. When the crew showed up to do the work they were on time as promised.


Anthony Cross

CMS Roofing
5.0
2019-02-11T21:02:33+00:00

Anthony Cross

I want to thank you and your employees for a job well done. I had called four different companies the day I called you. One company called me back in 4 days, another called back in 7 days and the third never did call back. Your estimator was at my house the next day as promised. When the crew showed up to do the work they were on time as promised.
5
4

Payment Options

 

Connect

Schedule Service